The company has finished the manufacture and shipping of 32 control cabinets
The company manufactured and shipped 32 control cabinets and control cabinets of the automated process control system. Oil treatment and control systems for clusters using telemechanics in one of the largest fields in Eastern Siberia.
The process control system is implemented on the Simatic S7-400H redundant controller using the new CPU 410-5H CPU with the remote SIMATIC S7-300 I / O system. The total number of signals is more than 3500.
Ahead of the important stage of installation of the "lower level" of automation, commissioning and commissioning of the entire complex.